ELECTRICAL TEMPLATES · CHECKLIST

Electrical inspection checklist

Written by Chameera Sampath · Not yet reviewed by a licensed electrician. See the methodology.

What an electrical inspection checklist is

An electrical inspection checklist is a list of the conditions an inspector, contractor or technician verifies on an electrical installation, recorded item by item as passed, failed or not applicable. On new work it follows the stages at which the authority having jurisdiction inspects, usually a rough-in inspection before walls are closed and a final inspection before the building is occupied.

Contractors run the same list before calling for an inspection, so that missing nail plates, overfilled boxes or unlabeled circuits are found by the crew rather than by the inspector.

What's included

Five sections with starting items: Service and grounding, Panelboards, Rough-in (boxes, cable support, box fill and nail plates), Final (devices, GFCI and AFCI protection, labeling and the panel directory) and Outdoor and special locations.

Every item takes a Pass, Fail or N/A result, a note and a photo note for the file name or location of a photo. Items can be edited, added, removed and moved up or down. A job header records the job name, address, inspector or technician and date, with an optional business name and logo, and a progress count shows how many items have been checked. The checklist saves in the browser and downloads as a US Letter PDF report without Ampxa branding.

How to use it

  1. Enter the job name, address, the person carrying out the inspection and the date.
  2. Remove items that do not apply to the job, or mark them N/A, and add any items the local inspector is known to look for.
  3. Work through the rough-in section before insulation and drywall, and the final section once devices, covers and luminaires are installed.
  4. Record each result, with a note for every Fail describing the location and what needs correcting.
  5. Download the PDF and keep it with the job file, or hand it to the customer.

Several items depend on a calculation rather than a look. Box fill can be checked with the box fill calculator, and breaker ratings against the load with the breaker size calculator. The difference between GFCI and AFCI protection is explained in GFCI vs AFCI, the service grounding items in grounding and bonding explained, and the path from the panel to each outlet in how house wiring works.

The checklist

Saved only in this browser on this device. This checklist is lost if browser data is cleared, and another browser or device does not have it. Download backup saves a JSON copy; Restore from backup opens a copy as a new, unsaved checklist and keeps the one it replaces.

Job details

0 of 42 checked · 0 pass · 0 fail · 0 N/A

Service and grounding 0/8

Panelboards 0/7

Rough-in 0/10

Final 0/10

Outdoor and special locations 0/7

Rough-in inspection vs final inspection

A rough-in inspection happens while the framing is still open. The inspector looks at what will be hidden: boxes and their fill, cable routing and support, protection of cables in framing, splices in boxes and the grounding of metal boxes. Once drywall is up these items can no longer be seen, so a failed rough-in item has to be corrected before the walls are closed.

A final inspection happens when the installation is complete and energized. It covers what the occupant will use: receptacles and switches, GFCI and AFCI protection, luminaires, covers, smoke alarms, the panel directory and the service equipment. Passing the final is commonly a condition for a certificate of occupancy or for the utility to connect permanent power.

Limitations

The starting items are general good practice, not a statement of what any code edition or jurisdiction requires. Inspection stages, required items and local amendments differ between authorities having jurisdiction, and the inspector's decision is the one that counts. The checklist is a preparation and record-keeping aid; it is not a substitute for the inspection or for the judgment of a licensed electrician. The template follows US (NEC) practice only.

Frequently asked questions

What does an electrical rough-in inspection check?

It covers the parts of the installation that will be concealed: box mounting and fill, cable support and securing, protection of cables near framing edges, splices and grounding in boxes, and the circuits run to each outlet. It takes place before insulation and wall coverings go on.

What is checked at an electrical final inspection?

The finished installation: devices and covers, receptacle polarity and grounding, GFCI and AFCI protection, luminaires, smoke and carbon monoxide alarms, the service equipment and a complete panel directory with every circuit identified.

Does passing this checklist mean an installation complies with the NEC?

No. The checklist prompts common checks; it does not cover every requirement of the code or of local amendments, and only the authority having jurisdiction approves an installation.

Can items be changed to match a local inspector's list?

Yes. Any item can be reworded, removed or moved, and new items can be added to each section. The changes are saved in the browser with the results.

How are photos handled?

Each item has a photo note field for a text reference, such as a photo's file name or where it was taken. Photos themselves stay on the camera or phone; the checklist stores text only.